Customization: | Available |
---|---|
Warranty: | One Year |
Max.Head: | >150m |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | Flow(m³/h) | Head(m) | Pump efficiency(%) | Shaft power (kW) | Speed(rpm) | Impeller outer diameter(mm) | Stage |
D12-50X11 | 12.5 | 550 | 45 | 41.63 | 2950 | 198 | 11 |
Attribute | Attribute | Attribute value |
Performance | Speed | 2950 |
Material | Impeller | HT250 |
Pump shaft | 40Cr | |
Bearing | SKF | |
Pump casing | HT250 | |
Working conditions | Medium temperatur(ºC) | Below 80ºC |
Installation | Inlet diameter(mm) | DN50 |
Outlet diameter(mm) | DN50 | |
Direction of rotation | Clockwise | |
Entrance orientation | Side entry | |
Exit orientation | Vertical up | |
Instructions | Low pressure male bottom | |
Motor | Number of motor phases | 3 |
Protection class | IP54 | |
Insulation class | F | |
Motor Power(kW) | 75 | |
Motor model | YE3-280S-2 | |
Power frequency(Hz) | 50 | |
Rated voltage(V) | 380 | |
Seal | Sealed form | Machinery Seal |
1. Q:Are you a manufacturer or trading company |
A:We are a manufacturer that specializes in industrial pump for 60 years |
2. Q:What payment term do you prefer? |
A:Normally we take payment term 30% T/T in advance,70% paid before shipment, we can also accept L/C at sight. |
3. Q:What about the package? |
A:Standard export plywood case |
4. Q:How long is the warranty? |
A: Eighteen (18) months after delivery, twelve (12) Months from the date of commissioning, whichever comes earlier |
5. Q:Is it acceptable to make customer's own brand? |
A: Sure, we can do OEM & ODM |
6. Q:How many days does it take for manufacturing? |
A: It depends on order quantity and pump types. Normally it takes 20-120 days |